Permafrost Applications

Sort gallery by:
View:
image
Water Tank; Wainwright AK 70SF Thermoprobes
image
Washeteria; Wainwright AK 9x 70SF Thermoprobes
image
DOT Road; Bethel AK 54x 70SF Thermoprobes (80' OAL)
image
DOT Road; Bethel AK 54x 70SF Thermoprobes (80' OAL)
image
Shop B; Deadhorse AK 60x 170SF Thermoprobes
image
Flight Service Station; Fairbanks AK Infrared photo of 210SF Thermoprobes while operational (winter)
image
Eva Creek Wind Farm, O&M Bldg; Ferry AK 5x 170SF Thermoprobes & 1x 70SF Thermoprobe
image
Shop B; Deadhorse AK Thermoprobe riser was modified onsite during field assembly to avoid a duct
image
Tracking Station; Thule Greenland 24x 70SF Thermoprobes. Trenched evaporator installation.
image
Long-Term Care Facility Entry; Nome AK 1x 31.5 SF Thermoprobe & 8x 31.5 SF Flat-Loop Thermoprobes
image
SID Drilling Support Complex Bldg; Nikaitchuq AK 27x 170SF Thermoprobes
image
KEA WTG Towers; Kotzebue AK 28x 31SF Spiral Thermoprobes
image
KEA WTG Towers; Kotzebue AK 28x 31SF Spiral Thermoprobes
image
Intertie Structure; Denali AK 8x 70SF Thermoprobes
image
Bulk Fuel Utility; Eek AK 6x 170SF Thermoprobes w/ offset risers
image
Kumtor Mine Portal; Kyrgyzstan Republic 5x 170SF Thermoprobes
image
Kumtor Mine Portal; Kyrgyzstan Republic Field assembly of evaporator sections for 170SF Thermoprobes. Worksite is at 11,000 feet elevation.
image
K-12 School; Nunam Iqua AK 36x 140SF Thermoprobes & 4x 70SF Thermoprobes
image
Hospital; Kotzebue AK 70SF Thermoprobes
image
Kumtor Mine Portal; Kyrgyzstan Republic Onsite Thermoprobe assembly